The revised National Planning Policy Framework published in August 2026 has changed how grey belt land is identified and how Green Belt is assessed. For landowners and promoters it has opened up more opportunities, but it has not removed the need for evidence. Whether a site is grey belt, and whether development on it is acceptable, still turns on how the land functions as part of the Green Belt, and much of that is a question of landscape and views.

This article summarises what has changed and explains where landscape and visual evidence makes the difference. It is a general guide, not legal advice, and the Framework and its Annex should always be read in full for a specific site.

What has changed in the 2026 Framework

The Green Belt policies are now set out as a series of numbered policies, GB1 to GB8, covering plan-making and decision-taking, with a national method for assessing Green Belt in Annex E. Three changes are particularly relevant to landowners:

Development on grey belt land can be "not inappropriate" in the Green Belt, but only where the Framework's further tests are met. These include that it would not fundamentally undermine the purposes of the remaining Green Belt taken together, considerations of need and a sustainable location, and, for major housing, the Golden Rules on affordable housing, infrastructure and green space.

Classification and acceptability are separate questions

Because the footnote 7 exclusion has been removed, more land can now meet the grey belt definition, including land in the setting of a National Landscape or a listed building. That does not mean development there will be acceptable. A site may be grey belt and still be refused because of its landscape or heritage effects. Landowners therefore need two kinds of evidence: evidence on the site's contribution to the Green Belt purposes, and evidence on the effects of the proposed development itself.

Why visual evidence matters

Openness is the essential characteristic of the Green Belt. The courts, including the Court of Appeal in Turner (2016) and the Supreme Court in Samuel Smith Old Brewery (2020), have confirmed that openness has a spatial dimension and a visual dimension, and that how a site is seen is a legitimate consideration.

The spatial dimension is largely a matter of measurement: the volume, footprint and extent of built form before and after development. The visual dimension is where judgement and evidence are needed, and it is often decisive. It asks:

Each of these questions links directly to purposes (a), (b) and (d), and each is answered through landscape and visual analysis: site survey, viewpoint photography, analysis of visual containment and boundaries, and, where helpful, Zones of Theoretical Visibility and wirelines.

What a landowner needs to show

A well-prepared landscape case for a grey belt site usually sets out:

Timing

Landscape evidence is most effective when it is prepared early: before land is acquired or optioned, in response to a call for sites, or before a planning application is designed. Early analysis can identify the parts of a site that perform weakly against the Green Belt purposes and steer development towards them, strengthening both the grey belt case and the eventual application.

In summary

The 2026 Framework has made grey belt easier to identify, but it has also made the quality of the evidence more important. The spatial effect of development can be calculated. The visual and landscape case, how the site is seen and what role it plays between town and countryside, needs to be demonstrated. That is where a focused landscape appraisal earns its place.

Need landscape evidence for a grey belt site?

We prepare Green Belt and grey belt landscape appraisals that set out how your site is seen, how it relates to the settlement edge and the wider countryside, and how development could be integrated. Tell us about your site and we will respond with a fixed fee within one working day.