What you are quoted is what you pay. We agree the scope before instruction and we work to a fixed fee — no hourly add-ons, no surprise charges, no fee creep.
Technical Note, LVA, LVIA and TVIA compared line by line, so you can see exactly what each level of assessment includes.
| Included in your assessment | TN | LVA | LVIA | LVIA (EIA) | TVIA |
|---|---|---|---|---|---|
| Proposal & Policy Review | |||||
| Proposal Review: Comprehensive analysis of the project and applicable planning policy | |||||
| Landscape Baseline | |||||
| Assessment of existing constraints | |||||
| Assessment of National Character Area studies | — | — | |||
| Regional and local landscape/townscape character studies | — | ||||
| Detailed site-level character analysis | |||||
| Landscape/townscape and constraints analysis maps | — | — | |||
| Visual Analysis & Fieldwork | |||||
| Visual envelope analysis | |||||
| Zone of Theoretical Visibility (ZTV) analysis | — | — | |||
| Site visit with Type 1 photography | — | Up to 6 viewpoints | Up to 12 viewpoints | Up to 12 viewpoints | Up to 12 viewpoints |
| Assessment & Reporting | |||||
| Note on potential landscape and visual effects | — | — | — | ||
| Landscape Assessment of Effects | — | — | With significance | ||
| Visual Assessment of Effects | — | — | With significance | ||
| Starting fee | £750(+VAT) | £1,950(+VAT) | £2,950(+VAT) | £3,950(+VAT) | £2,950(+VAT) |
Fixed fees by scheme size. Every landscape plan is a hard and soft landscape plan with planting and mitigation proposals, a planting schedule and a specification.
| Service | 1 house | 2–5 houses | 6–10 houses | Major development |
|---|---|---|---|---|
| Hard and soft landscape plan Planting and mitigation proposals, planting schedule and specification | £450 (+VAT) | £1,250 (+VAT) | £1,500 (+VAT) | from £1,750 (+VAT) |
| Landscape strategy or indicative masterplan Concept landscape framework for a larger site | — | — | — | from £1,250 (+VAT) |
| Landscape Management Plan (LMP / LEMP) Long-term management and maintenance to discharge landscape conditions | from £650 (+VAT) | from £1,250 (+VAT) | ||
All our visualisations are prepared in-house, in line with the Landscape Institute’s Technical Guidance Note 06/19, Visual Representation of Development Proposals: from simple 3D wirelines and photomontages to survey-verified Accurate Visual Representations (AVRs), built on a camera-position survey, calibrated photography and a verified 3D model.
| Visualisation (LI TGN 06/19) | What it shows | Typically used for | Fee |
|---|---|---|---|
| Type 1: annotated viewpoint photograph | The existing view, with the site and key features marked | Categories B to D: LVAs, design-led applications and pre-application work | Included in the assessment |
| Type 2: 3D wireline or model | The form and massing of the proposal shown as a 3D model, not overlaid on a photograph | All categories (A to D), including design development and option testing | £350 (+VAT) per view |
| Type 3: photowire or photomontage | The proposal overlaid on the viewpoint photograph, as a wireline or a rendered image | Categories A to C: most LVAs and LVIAs | £525 (+VAT) per view |
| Type 4: survey-verified photomontage (AVR) | A photomontage built on a camera-position survey and verified 3D model, so its accuracy can be checked | Categories A and B: EIA, public inquiry and contentious schemes | from £775 (+VAT) per view |
These fees apply when visualisations are commissioned as part of one of our LVAs, LVIAs or TVIAs. For visualisations on their own, please get in touch for a quote.
TGN 06/19 links the type of visualisation to the purpose of the application. We will recommend the right type when we scope your assessment.
| Category | Purpose | Appropriate types |
|---|---|---|
| A | Public inquiry evidence, most LVIAs prepared as part of an EIA, and LVAs for schemes that conflict with policy or are likely to be contentious | Types 2 to 4 |
| B | Most non-EIA applications with an LVA where landscape and visual effects are a concern and mitigation is needed, and some EIA LVIAs | Types 1 to 4 |
| C | Applications where character and appearance matter but no LVA or LVIA is needed, and the Planning or Design and Access Statement explains the landscape response | Types 1 to 3 |
| D | Design development with the client and pre-application discussions with the council, where the images are usually confidential | Types 1 and 2 |
Summarised from Table 1 of the Landscape Institute’s Technical Guidance Note 06/19.
Focused landscape evidence for specific planning questions, available on its own or alongside one of our assessments.
| Service | What it covers | Fee |
|---|---|---|
| Green Belt and grey belt landscape appraisal | Landscape and visual analysis of the site's contribution to Green Belt purposes and openness, and whether it qualifies as grey belt | from £1,450 |
| Residential Visual Amenity Assessment (RVAA) | Effects on the views and outlook from individual homes, assessed against the Landscape Institute's TGN 2/19 | from £1,950 |
| Site promotion and local plan landscape report | Landscape constraints, opportunities and capacity, for land acquisition, call for sites submissions and local plan representations | from £1,250 |
| Night-time and dark sky assessment | Night-time baseline survey and assessment of lighting effects, in the setting of dark skies | from £950 |
| Landscape lighting plan | External lighting layout and luminaire schedule to support an application or discharge a lighting condition | from £650 |
All fees exclude VAT. Where these are commissioned alongside an LVA or LVIA, we quote a combined fee.
Six factors determine where in the fee range your project sits. We will tell you exactly which apply to your site when we quote.
A 0.5 ha householder site is not the same as a 25 ha solar farm. Site area and complexity directly affect the time required.
Designations matter. Sites in National Landscapes, National Parks, or Conservation Areas require deeper baseline work and policy analysis.
More receptors means more fieldwork, more photography, and more assessment time. We agree viewpoint locations with you upfront.
Standard 15-working-day turnarounds are quoted at headline rates. Expedited delivery, where capacity allows, is priced separately.
Where the development triggers EIA under the 2017 Regulations, full LVIA chapter compliance and a Non-Technical Summary are required.
Where committed development needs to be factored in (cumulative ZTVs, sequential viewpoint analysis), additional baseline work is needed.
Location, proposal type and planning stage. A site location plan helps but isn't essential.
We assess the constraints, designations and likely policy issues. We recommend the right service tier — no upselling.
A clear scope, fixed fee and programme. No obligation, no hourly billing, no surprises.